W4 Car Wash Port Wentworth GA

New Construction

Status

Bidding Closed

Bid Date8/31/22 2:00pm

Company

...

Location

Price Mill Rd & State Hwy 21, Port Wentworth, GA 31407

Scope
3,454 SF Building, 2.21 Acres Site

Start: 30-60 Days
Completion: 9 Months

Site Scope of Work:
Erosion Control, Grading, Storm Drainage, Water, Sewer, Water Reclamation System, Site Concrete (Paving, Sidewalk, Curb & Gutter), Asphalt Paving, Pavement Marking & Signs, Landscaping

Dumpster Enclosure: Concrete, CMU, Brick, Gates, & Bollards

Vacuum Building: Concrete, CMU, Brick, Wood Trusses, Metal Roofing, Doors

Building Scope of Work:
Termite Treatment, Concrete (Foundation, Trench, Slab On Grade), Masonry (CMU, Brick), Misc Steel, Rough Carpentry Labor, Rough Carneptry Materials, Wood Trusses, Plastic Laminate Cabinets, Joint Sealants, CMU Foam Fill Insulation, EIFS, Standing Seam Metal Roofing, Doors, Frames, Finish Hardware, Overhead Doors, Storefront, Glass & Glazing, Metal Studs, Insulation, Drywall, Acoustical Ceilings, Ceramic Tile, Vinyl Base, “Extrutech” Wall & Ceiling Panels, Sealed Concrete, Painting, Toilet Accessories, Pre-Fabricated Canopies, Fire Extinguishers, Plumbing, HVAC, & Electric