Valvoline Smyrna GA

New Construction

Status

Bidding Closed

Bid Date12/7/22 4:00pm

Company

...

Location

3261 South Cobb Drive SE, Smyrna, GA 30080


Sub Bids Due: 11/30/22
Est Start Date: 1/3/2023
Est Build Cycle: 6 mos

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: .492 AC
Building SF: 2,092 SF
Structural Type: Wood Framed
Brief Project Description: Ground Up Valvoline Instant Oil Change. ROW Entrance/Work at SR 280 to be Completed by Others. Demo of Existing Structure by Others. Underground Detnetion on Site. Wood Framed Building with Brick/EIFS Exterior. Silikal at Interior. Please Include Digging/Backfilling with #57 Stone/Drains for Basement Walls.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes - Please include Cut/Backfill for Basement Wall (Refer to Geo Report)
2-f Site Utilities (Storm, Water, Sewer) Yes - Please include Underground Detention/Please include 4" Foundation Drains/Please include Stone Backfill for Basement Wall/Please include Flagman for Sewer Connection at Road
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes - Please include Patch Back at Sewer Connection
2-m Landscaping Yes
2-n Irrigation Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes - 3000/4000/Black Colored Concrete
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes
3-j Precast Concrete (Hollow Core, wall panels) Yes - Hollow Core
3-k Cast-in-Place Wall (CIP) Yes - CIP Wall in Basement

4. Masonry
4-a Brick Material Yes - Belden Modular Blend "A"
4-b Block Material Yes - 8" Reg/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes
4-k Precast (Sills, Water Table, Caps) Yes - Custom Cast Stone "Light Buff"

5. Metals
5-c Building Steel Turnkey Yes - Please include Stairs/Guardrail

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes
6-d Countertops Yes - Wilson Art "Baja Melange"
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-c Roofing - Shingle Roofing Yes - Owens Corning "Driftwood"/Please include Aluminum Gutter/Soffitt Berridge "Sierra Tan"
7-f Stucco or EFIS Yes
7-h Batt Insulation Yes
7-k Caulking Yes
7-l Moisture Protection Yes - Please include Drains at Basement Wall Footers and Fluid Applied Membrane per A1.1

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes - Clopay/OHD
8-e Storefront & Glass Yes - Kawneer Trifab VG 451T

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-d Flooring (VCT, Carpet, LVT) Yes - Please include Rubber Base
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes
9-g Flooring (Silikal) Yes
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes - Firestone Standing Seam Metal Awnings
10-h Site Accessories (Bike Racks, Trash Cans, etc) Yes - Bike Rack

15. Mechanical
15-a Plumbing Yes
15-b Fire Sprinkler Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes
16-e Fire Alarm Yes