City of Pinellas Park Sanitary Sewer Lift Station #5 and #7 Rehab Pinellas Park, FL

Renovation

Status

Bidding Closed

Bid Date2/8/23 10:00am

Company

...

Location

6901 46th St N. Pinellas Park, FL 33781 & 7601 43rd St. N. Pinellas Park, FL 33781

Construction Activities – Scope of Work:  The major elements of the proposed project work are summarized as follows: Furnish all labor, materials, and equipment necessary to rehabilitate the interior surface areas of existing sewer lift stations using a stand-alone structural cementitious liner system and epoxy coating where directed. The work includes mobilization, bypass pumping, MOT plans/signage, removing existing pumping equipment and appurtenances, abrasive blasting existing wet well for removal of any existing deteriorated coating, repair of concrete pitting as needed/directed, repair of stairs and landing platform as needed/directed, repair/update to stainless steel water lines within the wet well, furnishing and applying the specified cementitious and epoxy coating materials to the interior surface areas of the lift stations, testing, reinstallation of pumping equipment and appurtenances with new stainless steel hardware, safety alert system and associated fixtures updated to meet current NEC standards, clean-up, and demobilization. All Work must be completed by 180 calendar days after issuance of Notice-to-Proceed.