WalMart #2111-252 Hoover AL Remodel
Status
Bidding Closed
Bid Date1/21/22 2:00pm
Company
Location
5335 US-280
Striping, Paving, Curb & Gutter, Seal Coating, Selective Demo, Landscape and Irrigation, Fence, Garden Center Shade Structure, Concrete slab on Grade, Stamped Concrete, Floor Patching/Concrete infill, Masonry, Steel Erection, Steel Fabrication, Misc. Steel, Blocking, Millwork, Joint sealants, Waterproofing, Doors and Hardware (FBO), Overhead doors (FBO), Storefront (Auto doors FBO), Glazing, Acoustical ceiling, Metal stud framing, Drywall, Tape and Finish, Paint, Pressure Wash Exterior, Fixture Anchoring, Cleaning of Duct, NRP install only, E.I.F.S., Insulated Metal Wall Panels, TPO Roofing, Ceramic Tile Install only, Quarry Tile Install only, Resilient Flooring (FBO) Carpet flooring install only, Specialties, Partitions and Accessories install only, Energy Management Install, Sub metering Install, Refrigeration Install, HVAC (RTU FBO), Test & Balance FBO, Plumbing (Fixture package FBO), Lowering of Floor Drains, Fire Sprinkler system, Electrical (switch gear and fixtures FBO)
At this time Walmart is postponing this bid while the plans are split up to show the multiple phases of the project.
This Project has been Canceled.