Dairy Queen Socastee SC

New Construction

Status

Bidding Closed

Bid Date11/19/21 4:00pm

Company

...

Location

8960 Hwy 707

Est Start Date: 12/6/21
Est Build Cycle: 120 days

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 1.05 AC
Building SF: 6,936 SF
Structural Type: Wood Framed
Brief Project Description: Ground Up Dairy Queen. Asphalt paving at exterior with Concrete paving at drive thru lane and dumpster. Brick/EIFS/Hardie/ACM at exterior with Tile throughout interior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes
2-f Site Utilities (Storm, Water, Sewer) Yes
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-l Brick Pavers Yes – Concrete Pavers (See Detail on C5.2)
2-m Landscaping Yes
2-n Irrigation Yes
2-p Fencing Yes – Board on Board Cedar Siding for Dmpster Enclosure/Westbury Alumium Rail at Patio
2-q NPDES Monitoring Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes – 3000/4000 PSI
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes – Carolina Ceramics (Provincial – Allendale)
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

5. Metals
5-a Building Steel Material Yes – Misc. Steel/Bollards/Roof Ladder

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes – Install Owner Provided
6-d Countertops Yes – Install Owner Provided (Proivde and Install Millwork in Office)
6-h Kitchen Equipment (Install Only) Yes – Walk In Cooler/Freezer Install
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material – Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes – Please Include Tyvek Install
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-a Roofing – TPO, Duralast, Flat Roof Yes – Duralast White 50 MIL TPO (R-25 Min.) (Mechanically Attatched)
7-b Roofing – Metal Roofing Yes – Berridge Manufacturing Company
7-e ACM Panels Yes – At Drive Thru Window Section
7-f Stucco or EFIS Yes
7-g Hardie Board Yes
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes – YKK AP America (Please Include Red Spoon Handles in Quote)

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-e Flooring (Ceramic or Quarry Tile) Yes – Milestone (Mood Wood – “Honey”)/Metropiltan Ceramics (Quarry Basics – “Puritan Gray #507)
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes – Metal Awning w/ Aluminum Frame
10-z Knox Box Yes

15. Mechanical
15-a Plumbing Yes – Please Include Grease Trap and Roof Drains
15-e HVAC Turnkey Yes
15-f Refrigeration Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes – Please Include Lighting Package
16-f Low Voltage Wiring Yes