Laurel Ridge Elementary School Decatur, GA

Renovation
Full Set (click to expand/collapse)
Order this section for $194.40
This is available for download to registered users. Log in now
Order files below for $1.95 each
Name Size
A2.10 Overall Plan 330.5 KB
A2.11 Roof Plan 662.2 KB
A2.12 Enlarged Plans, Details & Door Schedule 264.8 KB
A6.01 Roof Details 349.6 KB
A11.01 Overall Reflected Ceiling Plan - Demolition 649.3 KB
A11.10 Overall Reflected Ceiling Plan 586.6 KB
A11.11 Reflected Ceiling Plan - Area A 849.1 KB
A11.12 Reflected Ceiling Plan -Areab 544.3 KB
A11.13 Reflected Ceiling Plan - Area C & Details 186.7 KB
C1.0 Coversheet 929.0 KB
C3.0 Layout & Staking Plan 700.7 KB
C5.0 Utility Plan 195.8 KB
C6.0 Construction Details I 3.8 MB
C7.0 Construction Details Ii 4.4 MB
E1.00 Electrical Legend, Notes, Schedules & Details 327.0 KB
E2.01 Electrical Floor Plan - Lighting 374.8 KB
E2.02 Electrical Floor Plan - Lighting 336.0 KB
E2.03 Electrical Floor Plan - Lighting 343.8 KB
E3.01 Electrical Floor Plan - Power 297.3 KB
E3.02 Electrical Floor Plan - Power 286.3 KB
E3.03 Electrical Floor Plan - Power 301.9 KB
E3.04 Electrical Roof Plan - Power 491.4 KB
E4.01 Electrical Floor Plan - Fire Alarm 283.3 KB
E4.02 Electrical Floor Plan - Fire Alarm 263.3 KB
E4.03 Electrical Floor Plan - Fire Alarm 279.7 KB
E5.01 Electrical Riser Diagram, Notes & Schedules 295.7 KB
E5.02 Electrical Panel Schedules 243.0 KB
EC1.0 Es&Pc Notes 262.1 KB
EC2.0 Initial Es&Pc Plan 157.3 KB
EC3.0 Final Es&Pc Plan 156.6 KB
EC4.0 Es&Pc Details 1 1.0 MB
EC5.0 Es&Pc Details Ii 558.4 KB
EC6.0 Es&Pc Details Iii 533.6 KB
FP0.00 Fire Protection Notes & Details 777.5 KB
FP2.00 Fire Protection Overall Plan 476.0 KB
FP2.01 Level 1 - Fire Protection New Work 458.9 KB
G0.00 Coversheet 507.4 KB
G0.01 General Information 397.9 KB
G0.02 Phasing Plan 482.6 KB
G0.03 Wall Penetration Details 329.2 KB
L0.00 Tree Removal & Replacement Plan 203.6 KB
M1.01 Level 1 - HVAC Area A Demo Duct 262.5 KB
M1.02 Level 1 - HVAC Area B Demo Duct 282.5 KB
M1.03 Level 1 - HVAC Area C Demo Duct 294.5 KB
M1.04 Roof-HVAC Demo 422.6 KB
M1.11 Level 1 - HVAC Overall - Demo Piping 376.1 KB
M2.01 Level 1 - HVAC Area A - N Ew Work Duct 244.5 KB
M2.02 Level 1 - HVAC Area B - New Work Duct 313.5 KB
M2.03 Level 1 - HVAC Area C - New Work Duct 309.3 KB
M2.04 Roof-HVAC New Work 400.9 KB
M2.11 Level 1 - HVAC Overall - New Work Piping 368.5 KB
M3.01 Basement-HVAC Area D 472.7 KB
M3.02 Level 1 - Mechanical Room 1.1 MB
M4.01 HVAC Details 208.4 KB
M4.02 HVAC Details 214.3 KB
M4.03 HVAC Details 249.8 KB
M4.04 HVAC Details 229.1 KB
M5.01 HVAC Schedules 181.0 KB
M6.01 HVAC Controls 178.4 KB
M6.02 HVAC Controls 223.1 KB
M6.03 HVAC Controls 207.3 KB
M6.04 HVAC Controls 205.9 KB
P0.01 Plumbing Notes & Schedules 172.6 KB
P1.01 Level 1 - Plumbing Demolition Plan 343.4 KB
P1.02 Roof - Plumbing Demolition Plan 210.5 KB
P2.01 Level 1 - Plumbing New Work Plan 411.6 KB
P2.02 Roof - Plumbing New Work Plan 311.5 KB
S1.01 General Notes & Overall Plan 1.3 MB
S2.01 Roof - Area A Framing Plan 179.7 KB
S2.02 Roof - Area B Framing Plan 147.3 KB
S3.01 Sections & Details 118.5 KB
V1.0 Survey 338.7 KB