Crunch Fitness O-Town Orlando FL

New Construction

Status

Bidding Closed

Bid Date9/1/21 4:00pm

Company

...

Location

Next Door to 11595 Daryl Carter Parkway

SCOPE: Sub Bids Due: 9/1/21
Est Start Date: 10/18
Est Build Cycle: 180 days

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: N/A
Building SF: 26,296 SF
Structural Type: CMU – Bar Joist
Brief Project Description: New building, pad ready site

2. Site Construction
2-r Surveying Yes-Asbuilt needed

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes-Thin Brick – Metro 507 Empire
4-b Block Material Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes
4-f Nichiha Panels Material Yes-Bark
4-g Nichiha Panel Install Yes-Bark
4-k Precast (Sills, Water Table, Caps) Yes-water table

5. Metals
5-a Building Steel Material Yes
5-b Building Steel Labor Yes
5-c Building Steel Turnkey Yes

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes
6-d Countertops Yes

7. Thermal and Moisture Protection
7-a Roofing – TPO, Duralast, Flat Roof .60 TPO over R-19 insulation
7-f Stucco or EFIS Yes
7-h Batt Insulation Yes
7-i Masonry Insulation Yes
7-k Caulking Yes
7-l Moisture Protection Yes
7-m Fire Proofing Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes
8-f Windows Yes

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-d Flooring (VCT, Carpet, LVT) Yes-Encore elevate bounce 2
9-e Flooring (Ceramic or Quarry Tile) Yes-Daltile
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes-Lm Scofield or equal
9-h Flooring (Rubber) Yes-Encore 10.5mm crunch blue
9-k Painting (Interior & Exterior) Yes-miscellaneous see responsibility matrix

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-c Restroom Partitions Yes
10-d Awnings Yes
10-u Elevators (including vertical lifts) Yes
10-z Knox Box Yes

15. Mechanical
15-a Plumbing Yes
15-b Fire Sprinkler Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes
16-e Fire Alarm Yes

ATTN DRYWALL SUBS:
Q: On the finish schedule on A-8.0 there are several rooms that call for C-5 ceilings. C-5 is not listed on the finish legend. Are those going to be rated ceilings?

A: That’s a typo or left over from another project. They should all be open to structure. I also see that the Men and Women’s toilets show C-4. They should be C-1. Follow the reflected ceiling plan.