RaceTrac McDonough GA

New Construction

Status

Bidding Closed

Bid Date4/28/22 12:00pm

Company

...

Location

761 & 744 HWY 155 S, McDonough, GA 30253

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 3.8 AC
Building SF: 8,702 SF
Structural Type: Block & Bar Joist
Brief Project Description: New RaceTrac Travel Center. Site is somewhat pre-graded with some trash disposal needed. Brick/ACM/EIFS exterior with DalTile throughout the interior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes
2-f Site Utilities (Storm, Water, Sewer) Yes – Please include Underground Detentions
2-h Fueling System Yes
2-j Striping & Site Signage Yes – Thermo at ROW
2-k Asphalt paving Yes – ROW Paving
2-m Landscaping Yes
2-n Irrigation Yes
2-o Retaining Wall Yes
2-p Fencing Yes – Timber Guardrail
2-q NPDES Monitoring Yes
2-r Surveying Yes – Please include As-Builts
2-s Construction Material Testing Yes
2-u Traffic Control (construction signage, cones, etc) Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes – 3000/4000 PSI
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes – Meridian Laredo/Mt Rushmore
4-b Block Material Yes – 8” Reg/8” BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

5. Metals
5-a Building Steel Material Yes
5-b Building Steel Labor Yes
5-c Building Steel Turnkey Yes

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-h Kitchen Equipment (Install Only) Yes – Install Only

7. Thermal and Moisture Protection
7-a Roofing – TPO, Duralast, Flat Roof Yes – Durolast 50 MIL Mechanically Fastened (R-30)
7-e ACM Panels Yes – Alcoa Reynobond PE
7-f Stucco or EFIS Yes – Include STO Guard Gold Coat
7-g Hardie Board Yes
7-h Batt Insulation Yes
7-k Caulking Yes – Foam insulation at Perimeter Gaps
7-l Moisture Protection Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes – National Account for Hardware
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes – Wayne Dalton 823C
8-e Storefront & Glass Yes – Oldcastle
8-g Window Film Yes – 3M Prestige 70 Solar Film

9. Finishes
9-a Acoustical Yes – Armstrong
9-b Drywall & Metal Studs Yes; please include wood blocking and plywood in your quote
9-e Flooring (Ceramic or Quarry Tile) Yes – DalTile Quarry and Porcelain
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes – Install Only
10-b Fire Extinguishers Yes
10-c Restroom Partitions Yes- Install Only
10-h Site Accessories (Bike Racks, Trash Cans, etc) Yes – Install Only
10-k Interior Signage (*signify if install only) Yes – install Only
10-l Exterior Building Signage (*signify if install only) Yes – Install Only

15. Mechanical
15-a Plumbing Yes
15-e HVAC Turnkey Yes
15-f Refrigeration Yes – Please include Erection of Coolers
15-g Mechanical Testing & Balance Yes

16. Electrical
16-a Lighting Material Yes – See Schedule on E001 & E011
16-b Gear Material Yes
16-d Electrical Turnkey Yes