SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 0.61 AC
Building SF: 3,763 SF
Structural Type: Wood Frame/ Wood Stud
Brief Project Description: Ground up Valvoline instant oil change with a basement. The building includes waterproofing, EFIS, Brick, and Shingle roofing.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes-Include cutting for the basement/ Please include dirt and #57 stone backfill (Furnish and install) for the backfill of pit walls, also include the GeoFabric/ Please include stone under pit slab furnish and install/ Please include the sump pump manholes furnish and install/ On site topsoil will be reused/ Please include unit prices for rock removal.
2-f Site Utilities (Storm, Water, Sewer) Yes- Please include sump pump manhole and the foundation drain.
2-j Striping & Site Signage Yes
2-m Landscaping Yes
2-n Irrigation Yes
2-o Retaining Wall Yes- Concrete Retaining Wall (ALT Modular Wall)
2-p Fencing Yes- 3ft metal fence on site retaining wall
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes- 3,000/4,000/4,500 PSI
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes- Please include Footings, pit slab, pit walls, slab on deck, and site concrete.
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes
3-k Cast-in-Place Wall (CIP) Yes- Basement CIP walls/ Site Retaining wall

4. Masonry
4-a Brick Material Yes- Belden "Modular Midland Blend"
4-b Block Material Yes- Dumpster enclosure (A10.1) 8" Smooth/ 8" Bond
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes
4-k Precast (Sills, Water Table, Caps) Yes- Price elevations and dumpster enclosure/ Custom Cast Stone "Light Buff"

5. Metals
5-c Building Steel Turnkey Yes- Steel at basement for floor support, Dumpster gates, Bollards, Misc. steel, and Steel Decking

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes- Please include the 5 Door cabinet in office.
6-d Countertops Yes
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes- Please do NOT price OSB, price plywood per specs
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-c Roofing - Shingle Roofing Yes- Owens Corning duration series driftwood
7-f Stucco or EFIS Yes- Dryvit (Sandpebble Fine)
7-h Batt Insulation Yes
7-k Caulking Yes
7-l Moisture Protection Yes- Please include GCP Bituthene 4000 with ADCOR 500 waterstop/ Include Tyvec commercial weather wrap/ Please price the waterproofing detail on A-1.1 and include the Hydroduct.

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes- Overhead door or Clopay products only
8-e Storefront & Glass Yes- Kawneer 451 per plans/ Please include any break metal shown

9. Finishes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-d Flooring (VCT, Carpet, LVT) Yes- Tarkett 12"x12"x1/8" VCT (Wax Floor) on Sheet A-1.2
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes- Masterkure CC 300 SB, 3 Coats min. Also provide light broom finish in Lube pit. Must be Silikal or Dur-a-flex products (No other product is allowed)
9-g Flooring (Silikal) Yes
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes - Firestone Una-clad Kynar 500/ Hylar metal 5000
10-h Site Accessories (Bike Racks, Trash Cans, etc) Yes- Bike Racks
10-z Knox Box Yes
10-aa Lockers Yes
10-hh Corner Guards Yes

15. Mechanical
15-a Plumbing Yes- Please include gas piping to generator
15-e HVAC Turnkey Yes

16. Electrical
16-d Electrical Turnkey Yes- Please include furnish and install of Generator