Express Oil Change Andalusia, AL
Status
Bidding Closed
Bid Date | 2/16/24 4:00pm |
Company
Location
1110 MLK Expressway Andalusia, AL 36420
SCOPE:
Sub Bids Due: 02/16/24
Est Start Date: 3/18/24
Est Build Cycle: 180 Days
SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 1.286 AC
Building SF: Oil Change Building: 2,001 SF Service Building: 3,083 SF
Structural Type: Masonry/ Wood Framed
Brief Project Description: Ground-up Express Oil Change and Service buildings in South AL near the FL line. Two buildings, please include both in pricing. Oil Change building features a basement with CIP concrete walls and foundation waterproofing (Including sump pump water discharge system). Site includes ALDOT ROW work on MLK Expressway/ Buildings & Dumpster consisting of same look with masonry exterior and metal roof system.
2. Site Construction
2-b Demolition (Interior or Exterior) Yes- Site Demo
2-c Erosion Control Yes
2-d Sitework, Grading Yes- Please include excavation, and backfill & compaction of the pit for building 1, refer to the architecturals/Please include site demo/ If you are including site concrete scope, please include everything on site/ Please include backfilling curbs and the basement CIP walls, include compaction/Please include any traffic control needed for work at MLK Expressway
2-f Site Utilities (Storm, Water, Sewer) Yes- Please include Sump Pump and Manhole structure, please include connection of discharge pipe to the storm system per C3.00 & per A-102 details/ Please include ALDOT Type B Grate for existing JB per C3.00/ Please include adjusting rims on existing sewer manholes/ Please include domestic and irrigation BFP's
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes- Heavy Duty and Light Duty/ Please include ALDOT paving on Sheet ALDOT 2, please include traffic control needed
2-m Landscaping Yes
2-n Irrigation Yes- Please include sleeves
2-q NPDES Monitoring Yes
2-r Surveying Yes
2-s Construction Material Testing Yes
3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY: 450-500 CY
3-c Concrete Labor Yes- Please include Basement walls/ Please include stone, rebar, pumps, and equipment/ Please break out site scope from building scope/ Please include both buildings
3-d Concrete Turnkey Proposals Yes- Please include Basement walls/ Please include stone, rebar, pumps, and equipment/ Please break out site scope from building scope/ Please include both buildings
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 350-400 TN
3-g Rebar / Wire Mesh Yes- Please include both buildings for concrete/ Site concrete/ Dumpster enclosure/ All Masonry
3-k Cast-in-Place Wall (CIP) Yes- Basement Walls
4. Masonry
4-a Brick Material Yes- Quik Brick Structural Half Highs
4-b Block Material Yes- Quik Brick Structural Half Highs/ 8" Reg/ 8" SF/ 8" Bond
4-c Masonry Accessories Yes
4-d Masonry Labor Yes- Please include both buildings & Dumpster enclosure
4-e Masonry Turnkey Yes- Please include both buildings & Dumpster enclosure
4-k Precast (Sills, Water Table, Caps) Yes
5. Metals
5-a Building Steel Material Yes- Please include both buildings & Dumpster enclosure
5-b Building Steel Labor Yes- Please include both buildings & Dumpster enclosure
5-c Building Steel Turnkey Yes- Please include both buildings & Dumpster enclosure
6. Carpentry
6-d Countertops Yes- Please include both buildings
6-i Wood Truss Material Yes- Please include both buildings
6-j Wood Truss Install Yes- Please include both buildings & Dumpster enclosure
6-k Lumber Material - Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes- Please include both buildings & Dumpster enclosure
6-m Bolt Package Yes- Please include both buildings
7. Thermal and Moisture Protection
7-b Roofing - Metal Roofing Yes- Please include both buildings & Dumpster enclosure
7-h Batt Insulation Yes- Please include both buildings
7-k Caulking Yes- Please include both buildings/ Please include 4" drain pipe at the footings/ Please include foundation waterproofing per A-102 details
7-l Moisture Protection Yes- Please include both buildings/ Please include 4" drain pipe at the footings/ Please include foundation waterproofing per A-102 details
8. Doors and Windows
8-a Doors, Frames, Hardware Yes- Please include both buildings
8-b Doors, Frames, Hardware Install Yes- Please include both buildings
8-c Garage/Roll-up Doors Yes- Please include both buildings
8-e Storefront & Glass Yes- Please include both buildings
9. Finishes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/ Please include both buildings
9-e Flooring (Ceramic or Quarry Tile) Yes- Please include both buildings
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes- Please include both buildings
9-k Painting (Interior & Exterior) Yes- Please include both buildings
10. Specialties
10-a Bathroom Accessories Yes- Please include both buildings
10-b Fire Extinguishers Yes- Please include both buildings
10-d Awnings Yes- CP Dothan- Jeff- (334) 798- 0330/ (1) 20' 4" Wide canopy
15. Mechanical
15-a Plumbing Yes- Please include both buildings/ Please include Oil Water Sep. for both buildings
15-e HVAC Turnkey Yes- Please include both buildings
16. Electrical
16-d Electrical Turnkey Yes- Please include both buildings