Wawa #5478 Crawfordsville, FL

New Construction

Status

Bidding Closed

Bid Date 8/27/24 4:00pm

Company

...

Location

18 Private Drive Crawfordville, FL 32327

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 4.22 AC
Building SF: 5,919 SF
Structural Type: Steel & Metal Stud Framed
Brief Project Description: Ground up Wawa gas station. This will be a pad ready site (Site Delivered to =/- .1'). All Items outside property limits will be handled by Landlord. Asphalt and Concrete on Site.  Brick/Hardie/EIFS at Exterior. Terrazo and Tile at Interior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes - Please Include Dry Detention Ponds/Please Include Spoils for Canopy, Sign and Building Footers/Please Include Grubbing Whatever Vegetation is on Pad Ready Site
2-f Site Utilities (Storm, Water, Sewer) Yes - Please Include Roof Drains/Please Include Water Line to Dumpster/Please Include Grease Trap
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-m Landscaping Yes
2-n Irrigation Yes
2-p Fencing Yes - Decorative Fencing at Interior and by Ice Chest (A1.0)/PVC Slats at Dumpster Gates
2-r Surveying Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  250
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include Stamped and Colored Concrete at Curb Islands at Building/Please Include Bases for HSS Columns at Front of Building
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 200
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes - Taylor Clay Products Thin Brick
4-b Block Material Yes - 8" Reg/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes - Please Include Tabs II System/Please Include Brick on Canopy Columns/Please Include Foundation CMU

5. Metals
5-c Building Steel Turnkey Yes - Steel Handrail at Sidewalk Ramp @ Site/Misc. Steel/Exterior Columns/Roof Ladder

6. Carpentry
6-a FRP Material Yes - Please Include Acrovyn
6-b FRP Install Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - Singly Ply TPO (R-25)/Please Include Install of Fenwall Overhang Canopy
z Roofing - Metal Roofing Yes - Please Include Longboard Tongue and Groove Panels at Front and Rear Soffit (A4.0)
7-f Stucco or EFIS Yes
7-g Hardie Board Yes - Hardie Cedarmill (A4.0)/Please Include Trex Screen System per A4.1/Please Include Hardie Screen Walls
7-h Batt Insulation Yes
7-k Caulking Yes - Please Include Waterproofing at Foundation CMU
7-l Moisture Protection Yes - Please Include Spray Foam Where Shown

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes - Kawneer Tri Fab 450 & Impact Rated 550/501/Please Include Spandrel Glass

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/Please Include Kicker Bracing at Roof/Please Include Rigid Insulation/Please Include Installing ACT3 Baffle Systems
9-e Flooring (Ceramic or Quarry Tile) Yes - Please Include Tile at Exterior of Building
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes - Terrazzo Flooring
9-j Flooring (Speciality) Yes - Walk Off Mats
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes - Fenwall Pre Fabricated Overhangs
10-f Blinds Yes - Manual Roller Shades

15. Mechanical
15-a Plumbing Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes - Please Include Conduit out to Canopy for PC to Connect