City of West Park Amphitheater West Park, FL

New Construction

Status

Bidding Closed

Bid Date 10/11/24 12:00pm

Company

...

Location

3501 SW 56th Ave West Park, Florida 33023

The work consists of, but is not limited to, the construction of a new 1,614 SF reinforced concrete amphitheater (covered stage platform, enclosed storage and electrical rooms, (2)ADA ramps)(Phase I) along with an 808 SF bathroom building (Phase II) as part of the cultural improvements at McTyre Park located at 3501 SW 56th Avenue, West Park, Florida 33023. Site work to include clearing/grubbing, earthwork/grading, concrete sidewalk, modified asphalt path, water/sewer utilities, stabilized drive, fencing, landscaping, and irrigation. The project requires the Contractor to provide full construction services including, but not limited to, all labor, materials, machinery, tools, supplies, services, equipment and incidentals necessary to construct the amphitheater and restroom in its entirety in accordance with contract plans prepared by CPZ Architects, Inc.