Lilburn Station Lilburn GA

New Construction
Addendum #1 (click to expand/collapse)
Order this section for $2.70
This is available for download to registered users. Log in now
Name Size
Add 1 693.2 KB
Addendum #2 (click to expand/collapse)
Contact your local LDI if you only need certain parts of this document.

ADDENDUM 2

1. Please see attached updated civil plans. The hatched areas on page C4 represent new asphalt and pavement. The grade is being changed in those areas so it will need to be repaved. We updated the tree chart to match the plan. We updated the erosion control plan from ds-3 (seeding) to ds4 sod.

2. The irrigation system is to be design/build.

3. Construction testing and special inspections to be provided by the general contractor.

4. Black finish color storefront and canopies have been approved by Chipotle. Metal wall panels are the Chipotle standard charcoal. The finish colors have been approved and will not match. Awning Above is the required vendor for all awnings.

5. The 6" DIP fire line shown on the civil plans will transition to a 4" line shown on the building plans.

6. The building is required to be fully sprinklered.
If you haven't yet - be sure to update your bid intent below - it is greatly appreciated.
Order this section for $4.02
This is available for download to registered users. Log in now
Name Size
Add 2 2.3 MB
Addendum #3 (click to expand/collapse)
Contact your local LDI if you only need certain parts of this document.
Order this section for $4.02
This is available for download to registered users. Log in now
Name Size
Add 3 14.5 MB
Addendum #4 (click to expand/collapse)
Contact your local LDI if you only need certain parts of this document.
Order this section for $48.24
This is available for download to registered users. Log in now
Name Size
Specs_Add04 17.6 MB