Valvoline Oil Change Decatur AL

New Construction

Status

Bidding Closed

Bid Date1/5/22 4:00pm

Company

...

Location

2607 US Hwy 31, Decatur, AL 35603

SCOPE OF WORK
DIV GENERAL DESCRIPTION
Site Acreage: .625 AC
Building SF: 2,080 SF
Structural Type: Wood Framed
Brief Project Description: New ground up Valvoline on existing site. New asphalt and concrete paving as well as black concrete landings. Wood framed building with concrete basement. EIFS and brick at exterior finishes with VCT, Mastekure and Silikal at interior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes – Please include Excavation and Backfill of Basement Walls/Landlord to provide access road, detention pond, rough grading and underground storm sewer
2-f Site Utilities (Storm, Water, Sewer) Yes
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-m Landscaping Yes
2-n Irrigation Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes – 3000/4000/Integral Black
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes
3-j Precast Concrete (Hollow Core, wall panels) Yes – Hollow Core
3-k Cast-in-Place Wall (CIP) Yes – Basement Walls

4. Masonry
4-a Brick Material Yes – Belden “Modular Midland Blend A”
4-b Block Material Yes – 8” Reg/8“BB/12” Reg
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

4-k Precast (Sills, Water Table, Caps) Yes – Custom Cast Stone “Light Buff”
5. Metals
5-a Building Steel Material Yes – Stairs/Guard Rails/Dumpster Gates & Frames/Bollards/Edge Steel

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-d Countertops Yes – Plam Countertops and Wall Cabinets
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material – Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-c Roofing – Shingle Roofing Yes – Owens Corning “Driftwood”
7-f Stucco or EFIS Yes
7-h Batt Insulation Yes – Please Include Tyvek
7-k Caulking Yes – Please include Air/Moisture Barrier Behind Brick
7-l Moisture Protection Yes – Please see detail 2 on A-1 for detail on pit walls

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes
8-e Storefront & Glass Yes

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-d Flooring (VCT, Carpet, LVT) Yes – 12” × 12” × 1/8” VCT Wax Floor
9-f Flooring (Polished, Stained,

Epoxy, Sealed) Yes – Masterkure CC 300
9-g Flooring (Silikal) Yes
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes – Firestone Standing Seam Metal
10-h Site Accessories (Bike Racks, Trash Cans, etc) Yes – U Shaped Bike Rack
10-m Kitchen Equipment (sales) Yes – Refrigerator (See CS-2 for spec)
10-ff Visual Display Board (White Boards, Tack Boards, etc) Yes – Cork Board
10-hh Corner Guards Yes – 1 1/4” × 1 1/4” × 16ga. SS

15. Mechanical
15-a Plumbing Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes