Dunkin Donuts Rockmart GA

New Construction

Status

Accepting Bids

Bid Date5/6/24 4:00pm

Company

...

Location

HWY 278 + Goodyear AVE Rockmart, GA 30153

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Building SF: 2,061 SF
Structural Type: Wood Framed
Brief Project Description: "Curb- In" & "Pad Ready" Dunkin Donuts. Everything within the curb line we are responsible for including and not limited to building, landscaping, sidewalks, patio, sign foundations, ect. Please see GN-3.0 for National Account contact information and GN-5.0 for Responsibility Matrix.

2. Site Construction
2-l Brick Pavers Yes
2-m Landscaping Yes
2-r Surveying Yes- Staking building corners
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  50 Cys
3-c Concrete Labor Yes- Please include install of the rigid insulation at foundation/ Please include footings for site accessories inside of curb and sidewalks
3-d Concrete Turnkey Proposals Yes- Please include install of the rigid insulation at foundation/ Please include footings for site accessories inside of curb and sidewalks
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 65TNs
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

5. Metals
5-c Building Steel Turnkey Yes- Misc. building steel/ Site work is by others

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes- Install only
6-d Countertops Yes- Install only
6-g Wood Exterior Trim/Siding Install Yes- Woodtone Siding
6-h Kitchen Equipment (Install Only) Yes- Misc. installs
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes- Single-Ply PVC or TPO Membrane with 15 year warranty- Please refer to specs on GN-1.3
7-b Roofing - Metal Roofing Yes- Please include metal bands on elevations
7-f Stucco or EFIS Yes- Dryvit
7-g Hardie Board Yes- Woodtone Siding
7-h Batt Insulation Yes
7-k Caulking Yes
7-l Moisture Protection Yes- Weather resistant barrier Tyvek

8. Doors and Windows
8-a Doors, Frames, Hardware Yes- Please include 24"x24" Metal Access Panel on Roof plan A-4.0
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes- Please include drive thru window and air curtain/ Please include break metal wrapping

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/ Please include installing doors, frames, and hardware/ Please include corner guards
9-e Flooring (Ceramic or Quarry Tile) Yes- Daltile
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes- Please include base
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes
10-dd Shelving Yes

15. Mechanical
15-a Plumbing Yes- Curb in project. Please include bringing utilities into building from curb line. Please include 1,500 Gal Grease Trap/ Please include roof drains and connecting them to storm system
15-e HVAC Turnkey Yes- Please include installing the hood package
15-f Refrigeration Yes- Quick connect start up
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes- Please include secondary to building from transformer pad