GSU MRRF ADA Campus Wide Improvements Atlanta, GA

Renovation

Status

Bidding Closed

Bid Date5/31/23 2:00pm

Company

...

Location

Multiple Locations

Project Description: The project includes the selective demolition of existing restroom finishes, fixtures, ceilings and selected walls and doors and the new, renovated, ADA accessible restrooms build-outs. Library South, Downtown Campus drawing set includes the renovation of the men’s and women’s restroom on the 3rd floor. Building SC, Decatur Campus drawing set includes the renovation of the men’s and women’s restroom on the 2nd floor, along with a new, additional ADA unisex restroom. Schedules and specifications are shared between the drawing sets. Drawing sets separated for location purposes only. Both locations to receive new finishes, fixtures, ceilings, doors, signage, toilet partitions, toilet accessories, etc. as documented in the drawing sets.

Please take note of the “DEDUCTIVE ALTERNATES” as listed here below: Alternates. We further propose that, should any of the following alternates be accepted and be incorporated in the Contract, the Bid will be altered in each case as follows: Deductive Alternates: 1. Install wall tile only up to 6’ high on walls. 2. Install wall tile only on wet walls. 3. Stainless steel toilet partitions become HDPE toilet partitions. BOD: ASI Global Partitions or approved equal; Pebblegrained; color TBD from manufacturers standard range of colors. 4. Quartz countertops become solid surface countertops; BOD: Corian or approved equal; color TBD from manufacturers standard range of colors. 5. Remove the Men’s room renovation from the Library South Project. 6. Remove Library South Project