Express Oil Change Warner Robins GA

New Construction

Status

Bidding Closed

Bid Date5/30/23 4:00pm

Company

...

Location

860 Highway 96, Warner Robins, GA 31088

Project Description: Site Acreage: 0.84 AC Building SF: 2,177 SF Structural Type: Wood Frame/ Wood Stud Brief Project Description: Ground-up Express Oil Change. Two new buildings, one service building, and one oil change building (please include both in the proposal). The oil service building will include a basement with waterproofing. Both buildings consist of Quikbrick and CMU. Tile and Sealed concrete floors. Dumpster enclosure to match the building with Trex board slats on the gate and a roof over the dumpster. 2. Site Construction 2-c Erosion Control Yes 2-d Sitework, Grading Yes- Please include cut for the basement and footings/ Please include the backfill for the pit walls/ Check Architecturals for depth/ Please include waterproofing detail on sheet OC-A102/ Please include the CCW MIRACLAY/ Please include #57 Stone around pipe. 2-f Site Utilities (Storm, Water, Sewer) Yes- Please include backflow preventer/ Please include importing topsoil/ Please include the foundation sump and the foundation pipe 2-g Septic System Yes 2-j Striping & Site Signage Yes 2-k Asphalt paving Yes 2-m Landscaping Yes 2-n Irrigation Yes 2-p Fencing Yes- Trex Slats on Dumpster enclosure gate- Steel contractor will furnish the frames 2-r Surveying Yes 2-s Construction Material Testing Yes 3. Concrete 3-a Soil Treatment Yes 3-b Concrete Material Yes- 3,000 & 4,000 PSI 3-c Concrete Labor Yes 3-d Concrete Turnkey Proposals Yes- Please include both buildings 3-e Concrete Pumping Yes 3-f Stone / Aggregate Yes 3-g Rebar / Wire Mesh Yes 3-k Cast-in-Place Wall (CIP) Yes- CIP Basement Walls 4. Masonry 4-a Brick Material Yes- Structural Half Highs (Cherokee Brick) 4-b Block Material Yes- 8" SF/ 8" SF BB/8" Reg/ 8" BB/ 12" Reg/ 12" SF 4-c Masonry Accessories Yes 4-d Masonry Labor Yes 4-e Masonry Turnkey Yes- Please include both buildings 4-k Precast (Sills, Water Table, Caps) Yes- Watertable by Echelon 5. Metals 5-c Building Steel Turnkey Yes- Please include the dumpster gate & post/ Bollards and misc. steel/ Ladder/Stairs/Handrail/ Guardrail/ Structural steel/ Please include both buildings 6. Carpentry 6-d Countertops Yes- Service Desk/ Coffee Cabinet G301 6-e Wood Interior Trim Material Yes 6-f Wood Interior Trim Install Yes 6-i Wood Truss Material Yes 6-j Wood Truss Install Yes- Please include both buildings 6-k Lumber Material - Structural Wood Yes- Please include the attic access hatch 6-l Lumber Install (Bldg Framing) Yes- Please include both buildings 6-m Bolt Package Yes 7. Thermal and Moisture Protection 7-b Roofing - Metal Roofing Yes- Please include dumpster roof and roof on second building 7-h Batt Insulation Yes 7-k Caulking Yes- Please include detail on A102 for foundation/ Please price the foundation drain 7-l Moisture Protection Yes- Please include detail on A102 for foundation/ Please price the foundation drain 8. Doors and Windows 8-a Doors, Frames, Hardware Yes- Please include both buildings 8-b Doors, Frames, Hardware Install Yes- Please include both buildings 8-c Garage/Roll-up Doors Yes- Please include both buildings 8-e Storefront & Glass Yes- Please include glass for interior doors 9. Finishes 9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/ Please include both buildings 9-e Flooring (Ceramic or Quarry Tile) Yes 9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes 9-k Painting (Interior & Exterior) Yes 10. Specialties 10-a Bathroom Accessories Yes 10-b Fire Extinguishers Yes 10-d Awnings Yes 10-hh Corner Guards Yes 15. Mechanical 15-a Plumbing Yes- Please include foundation sump and drain pipe at footing/ Please include the oil water separator/ Please include both buildings 15-e HVAC Turnkey Yes- Please include both buildings 16. Electrical 16-d Electrical Turnkey Yes- Please include both buildings.

 

Notes: Send bids to estimating@cbigc.com